Stock Condition Survey

stock_condition

Social housing stock assessment · Decent Homes Standard · 30-year investment planning · Sections A–I

Dynamic element codes: Sections B–F contain AI-generated elements. External elements use SE1–SE6 prefix, internal SI1–SI6, services SVC1+, health & safety HS1+, energy EN1+.
Condition Ratings (1–5):1 — Good2 — Satisfactory3 — Fair / Deteriorating4 — Poor5 — Very Poor / End of Life

A — Property Details

Flat section
FieldDescription
Property ReferenceUnique asset reference or UPRN for the property
Property AddressFull postal address of the inspected dwelling
Property TypeHouse / Flat / Maisonette / Bungalow — and construction type
No. of BedroomsBedroom count for the dwelling
TenureSocial rented / Shared ownership / Leasehold
Year of ConstructionApproximate year built — used for investment forecasting
InspectorSurveyor's name
Inspection DateDate of on-site inspection
Overall Condition RatingAggregate 1–5 rating for the whole dwelling
Property OverviewAI-drafted summary of overall stock condition — editable narrative

B — External Elements

Dynamic elements · codes SE1–SE6
CodeElement (examples)Fields per element
SE1Roof coveringRating (1–5) · Description · Recommended action · Year installed · Remaining life (years) · Investment category · Cost band (£)
SE2External walls
SE3Windows
SE4Doors
SE5Gutters & rainwater goods
SE6Chimneys / roof structures
SE7+Additional external elements from AI analysis

C — Internal Elements

Dynamic elements · codes SI1–SI6
CodeElement (examples)Fields per element
SI1KitchenRating (1–5) · Description · Recommended action · Year installed · Remaining life (years) · Investment category · Cost band (£)
SI2Bathroom
SI3Internal walls / ceilings
SI4Floors
SI5Internal doors
SI6Communal / staircase areas
SI7+Additional internal elements from AI analysis

D — Services

Dynamic elements · codes SVC1+
CodeElement (examples)Fields per element
SVC1Heating system / boilerCondition (1–5) · Description · Recommended replacement year · Notes
SVC2Electrical installation
SVC3Hot water system
SVC4Cold water supply
SVC5Drainage & soil pipes
SVC6+Additional services from AI analysis

E — Health & Safety

Dynamic elements · codes HS1+
CodeElement (examples)Fields per element
HS1Electrical hazard (HHSRS Cat 1)Status (Pass / Fail / Action Required) · Notes / description
HS2Fall hazard
HS3Fire hazard
HS4Damp & mould (HHSRS)
HS5+Additional H&S items from AI analysis

F — Energy & Insulation

Dynamic elements · codes EN1+
CodeElement (examples)Fields per element
EN1Loft insulationStatus (Present / Absent / Upgrade needed) · Notes / specification
EN2Wall insulation (cavity / solid)
EN3Double glazing
EN4Heating controls / smart thermostat
EN5+Additional energy items from AI analysis

G — Decent Homes Assessment

Fixed criteria
CodeCriterionPass / Fail logic
DH1Meets current statutory minimum standardNo Category 1 hazards under HHSRS — references HS section results
DH2In a reasonable state of repairNo key building components that are old and require replacing — references SE/SI ratings
DH3Has reasonably modern facilitiesKitchen ≤30 yrs, bathroom ≤30 yrs, adequate insulation — references SI1/SI2 year installed
DH4Provides a reasonable degree of thermal comfortEffective heating system and adequate insulation — references SVC1 and EN section
Overall Decent Homes CompliantPass only if DH1–DH4 all pass · Non-compliance triggers works programme

H — Recommended Works Programme

Flat section
CategoryTimeframeDescription
Urgent WorksWithin 12 monthsSafety-critical and Decent Homes non-compliance items — list with estimated cost
Programmed Works2–5 yearsPlanned replacements and major repairs — components approaching end of life
Planned Works5–10 yearsLonger-term investment items — components with remaining life 5–10 years

I — 30-Year Investment Programme

Flat section
Line itemDescription
Catch-up Total (£)Cost to bring the property to Decent Homes standard immediately
Future Major Works Total (£)Forecast cost of component replacements over 30 years
Improvements Total (£)Enhancement works (energy upgrades, accessibility, etc.) over 30 years
Revenue (p.a.) (£)Annual rental income — used to calculate net investment requirement
Years 1–5 (£)Investment required in the first 5 years
Years 6–15 (£)Investment required years 6–15
Years 16–30 (£)Investment required years 16–30
Total 30-Year Investment (£)Grand total investment forecast over 30-year period

Start a Stock Condition Survey

Upload your inspection photos and let AI draft the full report in minutes.